Energy Standard: NECB 2017 Performance Path
Location: Olds, AB
Year Modelled: 2020
Services Provided: Preliminary and Building Permit Energy Modelling
The AG Tech Hub at Olds College includes an addition and extensive renovation to the existing building which consists of one level with a central atrium, and the total floor area is approximately 3,100 m2.
Energy Standard: NECB 2017 Performance Path
Location: Calgary, AB
Year Modelled: 2020
Services Provided: Preliminary and Building Permit Energy Modelling
Harmony Engineering provided preliminary and building permit energy modelling for a new Sailing School; a single storey 240 m2 school consisting of a classroom, locker room, storage rooms, and washrooms.
Energy Standard: Carbon Neutral Capital Program
Location: Fruitvale, BC
Year Modelled: 2020
Services Provided: Envelope Upgrade, Parametric Analysis
Fruitvale Elementary School is a 4,300 m2 education facility. Harmony Engineering completed an energy analysis to clarify the anticipated energy and cost savings associated with the building envelope upgrade. Green house gas savings were assessed and presented based on proposed upgrades.