Airtightness tests or blower door tests measure a building’s air leakage rates, allowing us to quantify the associated energy loss.
At Harmony Engineering, we are familiar with the different testing and reporting standards required for a variety of different project and building types. We have experience performing blower door tests on a range of projects, from multi-unit residential buildings to college campuses, office buildings and long-term care facilities.
All on site testing is conducted with up-to-date calibrated Retrotec equipment.
All Part 3 blower door test reports are verified and stamped by a Professional Engineer.
Mid-Construction Airtightness Testing
Mid construction tests confirm whether a project is on track to meet it’s intended airtightness target, performed at a time in the building process where it is still easy to make corrections and address deficiencies in the air barrier.
Final Airtightness Testing:
With recent code updates, all new buildings are now required to undergo final airtightness testing prior to occupancy. Some projects may have additional requirements, such as inter-suite testing required by BC Housing.
PART 3
Multi-Unit Residential & Commercial Buildings
Have a project in mind?
Fill out the form below to tell us about your needs, and our team will get back to you with expert guidance and next steps.
Let’s bring your vision to life with precision and efficiency!